An online home for all my railway ramblings both model and prototype. This blog features regular updates on my varied model railway projects as well as occasional forays into the real world.
Saturday, 19 June 2010
Tuesday, 8 June 2010
A brief update and an excuse
If anyone actually reads this, you may have wondered why I've not updated lately. The first image goes someway to showing that Widnes Road is back up and running having been stacked away since the exhibition. There are some more images to follow when my friend Jim, who took some high quality images with an SLR has processed them. This was simply one I took with my 'point and click' after I'd set the lighting up.
The second image explains the absence. I got distracted by my birthday present to myself. A brand new Triumph Street Triple motorcycle. A truly fantastic piece of engineering, and provider of some of the most fun it is possible to have. Normal service will now resume; as I have a couple of blocks of low-relief flats to construct...oh, and a pub and row of shops.
Bye for now,
Paul
Saturday, 24 April 2010
Some pictures from the Welwyn GC Exhibition
Living the life of a somewhat subterranean railway modeler its not often that what I build has the benefit of good natural lighting. Last weekends exhibition in Welwyn Garden City was a real opportunity to take some photos, as it was blessed with excellent lighting on a bright spring day. Despite only having a compact digital camera with me I was pleased with the results.
There is a few months until a good run of four exhibitions in close succession in the Autumn. This means I can get cracking on the parade of shops which will form the other side of Widnes Road and complete the western end of the layout. A combination of kit-bashing and detailing is the order of the day. I'm on the lookout for any company that does the basic components for shop interiors in 4mm and a decent kit to base a detailed public house on.
Wednesday, 7 April 2010
Widnes Road Signal Box - Part III
Tuesday, 6 April 2010
Widnes Road Signal Box - Part II
Saturday, 3 April 2010
Widnes Road Signal Box
Sunday, 14 March 2010
Widnes Road - Level Crossing
Sunday, 21 February 2010
Widnes Road Update 2010
Firstly, here is a quick list of the next 5 confirmed exhibition dates for Widnes Road
2010
17th April De Havilland MRC Welwyn Garden City
18th September Mid Essex MRC High School, Oliver Road, Shenfield
2nd/3rd October Ilford & West Essex MRC Romford
9th October The Leventhorpe School Sawbridgeworth, Hertfordshire
13th November Romford MRC
Secondly, a quick round-up of what I've been working on and what's in store for the 2010 exhibition season.
Having got fed-up with continually fixing the plastic handrails around the roof of the depot, I fabricated new ones from square-section brass rod; when painted up they look a lot finer scale, and have the added benefit of not snapping every time the track is cleaned. This was followed by the fitting of a number of 'express models' depot lamps to the buildings and yard area.
Having got fed-up with continually fixing the plastic handrails around the roof of the depot, I fabricated new ones from square-section brass rod; when painted up they look a lot finer scale, and have the added benefit of not snapping every time the track is cleaned. This was followed by the fitting of a number of 'express models' depot lamps to the buildings and yard area. The next changes are a lot more drastic, and are still under construction. The final extension to the layout will see a level crossing installed to Widnes Road at the far left hand side; the front road in the yard being straightened and converted to a through line. This required the painful act of removing a significant section of scenery and track to enable the realigned line to exit across the main road and onto a second fiddle yard.
At present I've laid the new track and I'm now contemplating whether to go for conventional level-crossing gates or working modern barriers. Current thinking is for the older style level crossing gates and the through line is for freight services to the Runcorn Docks and chemical works and would have been unlikely to have justified the expense of fitting automatic gates.
I'm looking forward to the new Bachmann 03, as this will be perfect for short trip-working trains of a few chemical tanks running across the main road.
At present I've laid the new track and I'm now contemplating whether to go for conventional level-crossing gates or working modern barriers. Current thinking is for the older style level crossing gates and the through line is for freight services to the Runcorn Docks and chemical works and would have been unlikely to have justified the expense of fitting automatic gates.
I'm looking forward to the new Bachmann 03, as this will be perfect for short trip-working trains of a few chemical tanks running across the main road.
Thursday, 24 December 2009
7mm SPA Progress
I've completed the assembly of the first of the 7mm kits I've been working on, and I think the result is quite reasonable given the fairly rough and ready nature of the mouldings.The lack of believable brake levers led to a rummaging through the 'bits' box; parts were borrowed from the leftovers from previous kits, one side from a Grampus the other from a VGA. It goes to emphasise why you should never through anything away.
All that remains is to give it a coat of Railfreight 'flame red', and apply transfers.
Saturday, 12 December 2009
Saturday, 5 December 2009
Stock Weathering
I've been spending some spare time working on the new stock I have acquired for Widnes road lately. I try not to run anything 'out the box' for too long; so the new Class 25 has now had buffers replaced, detail parts added, and using 1500 grade wet and dry I have taken the shine off the body work.I spent a couple of hours this afternoon weathering it and this shows the end result. A combination of Carr's weathering powders and a light airbrushing with three tones going from frame dirt and brake dust to smoke black.
Monday, 23 November 2009
A break from 4mm - some O-gauge wagons
As last weekend was the final outing for Widnes Road for 2009, as illustrated by a new shiny Bachmann 150 Sprinter basking in the sunshine above; and with a nearly 5 month break until the next exhibition, there is a chance to get down to some proper model making.
I have always been someone who tends to hoard kits if I can pick them up for a reasonable price, even if I don't have a current project which they would suit. A case in point is the reasonable selection of 7mm modern image wagon kits I have accumulated from e-bay.
The first one onto the work bench is a resin / white metal SPA / ZDA Sea Urchin. The image above is the result of about 6 hours work filling and sanding as most parts had air bubbles or in the case of the metal parts, fairly large gaps in the castings. After a bit of work however, I'm fairly convinced I can get a decent model from a really quite cheap purchase.
The next photo shows the rather less 'economical' purchase which has spurred me on to get back to some 7mm modelling. Having been on the look out for some more HEAs to add to the one I completed in the summer, at the Royston show on Saturday I acquired not one but five, and very tidy they are too. With a half-decent speedlink train coming together I now have the impetus to build a few more wagons, as well as getting some track laid in the garden in the Spring.
Monday, 16 November 2009
Layout and stock tweaks
Having spent two days running Widnes Road at Tolworth Showtrain, I used part of a day off to make some minor tweaks to the layout. The most time consuming was lengthening No.3 Road in the yard to enable longer locos to fit with a full rake of dogfish & sharks.Although it doesn't look as if much has altered it still took the best part of 4 hours work to lay a short length of track, relocate the bufferstop and light, and paint and ballast the track.
A full rake of 9 wagons plus a Class 47 or 45 can now fit in the headshunt.I purchased one of Bachmann's latest DCC Sound Class 25's from Kent Garden Railways at the show, a pretty decent model straight from the box.
One retrograde step, I think, has been the substitution of the older unsprung metal buffers with sprung plastic ones. these seem quite crude in comparison, particularly when viewed side-on. It 's a simple step to resolve this as the plastic buffers are easily removed with a pair of pliers. The replacements are turned blackened
brass Oleos.
Sunday, 15 November 2009
Photos from Tolworth Showtrain

This weekend Malcolm and I spent a very enjoyable two days at the exhibition of the Hampton Court Model Railway Club. About the right size for a show with a nice balance of trade stands and exhibitors; and a decent mix of UK and continental layouts.I was particularly impressed by a Swiss layout, Rhatia, last years Showtrain Cup winner, which I spent a fair while watching.
I have uploaded a few snaps taken of Widnes Road in action over the weekend as well as a couple of shots of Rhatia.
Hello to all the people who stopped for a chat, it was good to meet so many genuinely interested modelers. For those who were asking about the frog polarity changing power supply device; its called a 'Hex Frog Juicer', available from the people at Tam Valley Depot, and sold online by Fast Tracks (not Making Tracks as I mistakenly told someone).



Subscribe to:
Posts (Atom)































