Update - April 2014, Widnes Road has now gone to a new home. New model railway projects are now in the planning stages.
An online home for all my railway ramblings both model and prototype. This blog features regular updates on my varied model railway projects as well as occasional forays into the real world.
Showing posts with label Widnes Road. Show all posts
Showing posts with label Widnes Road. Show all posts
Thursday, 23 January 2014
Widnes Road - (For Sale)- SOLD
Widnes Road finishes its exhibition life in February 2014, with a final showing at Stafford Showground and will be potentially FOR SALE after this date to free up some room for my next project. Please contact me with 'sensible' offers if interested in taking on this well known exhibition layout.
Sunday, 18 September 2011
Monday, 29 August 2011
Nearly ready for the Autumn exhibitions
A few pictures of the extension to Widnes Road which has been taking shape over the summer. The new scenic board with sandstone hills are based on Runcorn Hill, with a slightly geographically repositioned pub, The Prospect also from Runcorn, forming part of a small hamlet on top. The electrified track which passes through the new scene is the line which diverges from the main line at Runcorn station and serves Folly Lane.
The concrete hardstanding to the foreground is a place-holder until I can find a suitable kit for a chlorine plant, the front two tracks will eventually serve the chemical works.
Monday, 18 April 2011
Widnes Road - Western Extension
Having completed fiddle yard V.1.4, I can finally start on the interesting bit, the extension to the western, scenic end of the layout. This will include a chemical works / tanker unloading depot, consisting of two sidings, the second of which will have a loco shunt release via a double slip onto the through line. The images alongside show the first piece of trackwork I have completed, a conjoined pair of B6 r/hand turnouts, constructed as a single track panel over the last few weeks.
The next track panel to be contructed slots onto the furthest right road in this picture (the through line) and will consist of a trailing curved l/hand leading back toward the camera. this will serve as a cripple sideing for a couple of wagons, plus storage for the shunter which will stable this side of the level crossing and serve the chemical works traffic.
The final track panel will consist of a double slip, joining roads 2 and 3 and divering into a single road heading to a hidden fiddle yard, and a headshunt.
The next track panel to be contructed slots onto the furthest right road in this picture (the through line) and will consist of a trailing curved l/hand leading back toward the camera. this will serve as a cripple sideing for a couple of wagons, plus storage for the shunter which will stable this side of the level crossing and serve the chemical works traffic.
The final track panel will consist of a double slip, joining roads 2 and 3 and divering into a single road heading to a hidden fiddle yard, and a headshunt.
Widnes Road - Fiddle Yard Mk.IV
The high level road seen at the rear of the yard is now wired, and can be used as both a programme track and a test track during exhibitions, when running a loco on the layout only for it to die after three feet can prove embarrassing.
Thursday, 7 April 2011
Widnes Road - A short picture update and Exhibition Dates
Photos courtesy of Tim Reynolds (Cambridge MRC)
Widnes Road - Exhibition Dates - Autumn 2011
1st & 2nd October - Folkestone MRC Leas Cliff Hall, Folkestone
5th & 6th November - Alsager Railway Association, Crewe Alsager - Civic Centre, Stoke
19th & 20th November - Warley National Model Railway Exhibition - NEC, Birmingham
After attending three exhibitions in the early Spring, both Widnes Road and its operators are taking a break from the circuit for a five month period. The next dates are given above, a fairly intense set of two day shows, also getting to parts of the country where we can meet new faces, and also get to see layouts that never make it to the depths of Essex and Kent, our usual 'patch'.
The next five months will be a phase of fairly intense work on the layout, as the final stage on converting Widnes Road from a simple fiddle yard to depot layout as originally built six years ago into a full end-to-end railway capable of running through trains takes place.
This has partly come about from the explosion of excellent 'depot' layouts over the last few years, and partly because after more than 20 exhibitions in its current form, I need to keep things interesting both for me and the layouts operators and audience.
The first stage of the works has already taken place, the existing 5-road traverser has been completely rebuilt, now measuring 5'5" in length, the maximum that will fit across the inside of a Transit van. Once the second fiddle yard is finished, this will allow reasonably long rakes of stock to pass through the scenic section of Widnes Road, adding visual interest between the usual loco moves and shunting of the yard.
As well as being dictated by the width of a Transit, I'm keen to run the occasional through parcels rake, or perhaps a diverted inter-regional passenger as well as the ubiquitous DMU, so the fiddle yard is capable of accommodating a Class 45 Peak and 5 of Bachmann's MkII's or a similar number of GUVs.
The next focus is getting the pointwork built for the third and final scenic board in time for testing in the summer, and being complete with scenery by Warley at the end of November.
After attending three exhibitions in the early Spring, both Widnes Road and its operators are taking a break from the circuit for a five month period. The next dates are given above, a fairly intense set of two day shows, also getting to parts of the country where we can meet new faces, and also get to see layouts that never make it to the depths of Essex and Kent, our usual 'patch'.
The next five months will be a phase of fairly intense work on the layout, as the final stage on converting Widnes Road from a simple fiddle yard to depot layout as originally built six years ago into a full end-to-end railway capable of running through trains takes place.
This has partly come about from the explosion of excellent 'depot' layouts over the last few years, and partly because after more than 20 exhibitions in its current form, I need to keep things interesting both for me and the layouts operators and audience.
The first stage of the works has already taken place, the existing 5-road traverser has been completely rebuilt, now measuring 5'5" in length, the maximum that will fit across the inside of a Transit van. Once the second fiddle yard is finished, this will allow reasonably long rakes of stock to pass through the scenic section of Widnes Road, adding visual interest between the usual loco moves and shunting of the yard.
As well as being dictated by the width of a Transit, I'm keen to run the occasional through parcels rake, or perhaps a diverted inter-regional passenger as well as the ubiquitous DMU, so the fiddle yard is capable of accommodating a Class 45 Peak and 5 of Bachmann's MkII's or a similar number of GUVs.
The next focus is getting the pointwork built for the third and final scenic board in time for testing in the summer, and being complete with scenery by Warley at the end of November.
Friday, 17 September 2010
The Great Flood
Over the summer I had planned to start work on the final scenic board for Widnes Road, an extension to the left of the level crossing which splits with one road heading to a short, single platform face for DMU traffic and a through road passing under a skewed bridge to a short fiddle yard to enable through trains.
Unfortunately a burst pipe in the ceiling above my modelling room put paid to that idea, and instead the last two months have been spent repairing damage to the house and to a lesser extent, Widnes Road. Luckily the main leak missed all the layouts but there was still a bit of work required. I did manage to complete one piece of new scenery, rather than just replacement; and that was a block of flats to fill in a blank space at the rear. With the addition of some figures and vehicles I'm pleased with the result so far. I just need to add some photoshopped images to the back skypaper to fill in the gaps.
Unfortunately a burst pipe in the ceiling above my modelling room put paid to that idea, and instead the last two months have been spent repairing damage to the house and to a lesser extent, Widnes Road. Luckily the main leak missed all the layouts but there was still a bit of work required. I did manage to complete one piece of new scenery, rather than just replacement; and that was a block of flats to fill in a blank space at the rear. With the addition of some figures and vehicles I'm pleased with the result so far. I just need to add some photoshopped images to the back skypaper to fill in the gaps.
Saturday, 19 June 2010
Saturday, 24 April 2010
Some pictures from the Welwyn GC Exhibition
Living the life of a somewhat subterranean railway modeler its not often that what I build has the benefit of good natural lighting. Last weekends exhibition in Welwyn Garden City was a real opportunity to take some photos, as it was blessed with excellent lighting on a bright spring day. Despite only having a compact digital camera with me I was pleased with the results.
There is a few months until a good run of four exhibitions in close succession in the Autumn. This means I can get cracking on the parade of shops which will form the other side of Widnes Road and complete the western end of the layout. A combination of kit-bashing and detailing is the order of the day. I'm on the lookout for any company that does the basic components for shop interiors in 4mm and a decent kit to base a detailed public house on.
Wednesday, 7 April 2010
Widnes Road Signal Box - Part III
Tuesday, 6 April 2010
Widnes Road Signal Box - Part II
Saturday, 3 April 2010
Widnes Road Signal Box
Sunday, 14 March 2010
Widnes Road - Level Crossing
Sunday, 21 February 2010
Widnes Road Update 2010
Firstly, here is a quick list of the next 5 confirmed exhibition dates for Widnes Road
2010
17th April De Havilland MRC Welwyn Garden City
18th September Mid Essex MRC High School, Oliver Road, Shenfield
2nd/3rd October Ilford & West Essex MRC Romford
9th October The Leventhorpe School Sawbridgeworth, Hertfordshire
13th November Romford MRC
Secondly, a quick round-up of what I've been working on and what's in store for the 2010 exhibition season.
Having got fed-up with continually fixing the plastic handrails around the roof of the depot, I fabricated new ones from square-section brass rod; when painted up they look a lot finer scale, and have the added benefit of not snapping every time the track is cleaned. This was followed by the fitting of a number of 'express models' depot lamps to the buildings and yard area.
Having got fed-up with continually fixing the plastic handrails around the roof of the depot, I fabricated new ones from square-section brass rod; when painted up they look a lot finer scale, and have the added benefit of not snapping every time the track is cleaned. This was followed by the fitting of a number of 'express models' depot lamps to the buildings and yard area. The next changes are a lot more drastic, and are still under construction. The final extension to the layout will see a level crossing installed to Widnes Road at the far left hand side; the front road in the yard being straightened and converted to a through line. This required the painful act of removing a significant section of scenery and track to enable the realigned line to exit across the main road and onto a second fiddle yard.
At present I've laid the new track and I'm now contemplating whether to go for conventional level-crossing gates or working modern barriers. Current thinking is for the older style level crossing gates and the through line is for freight services to the Runcorn Docks and chemical works and would have been unlikely to have justified the expense of fitting automatic gates.
I'm looking forward to the new Bachmann 03, as this will be perfect for short trip-working trains of a few chemical tanks running across the main road.
At present I've laid the new track and I'm now contemplating whether to go for conventional level-crossing gates or working modern barriers. Current thinking is for the older style level crossing gates and the through line is for freight services to the Runcorn Docks and chemical works and would have been unlikely to have justified the expense of fitting automatic gates.
I'm looking forward to the new Bachmann 03, as this will be perfect for short trip-working trains of a few chemical tanks running across the main road.
Thursday, 24 December 2009
7mm SPA Progress
I've completed the assembly of the first of the 7mm kits I've been working on, and I think the result is quite reasonable given the fairly rough and ready nature of the mouldings.The lack of believable brake levers led to a rummaging through the 'bits' box; parts were borrowed from the leftovers from previous kits, one side from a Grampus the other from a VGA. It goes to emphasise why you should never through anything away.
All that remains is to give it a coat of Railfreight 'flame red', and apply transfers.
Subscribe to:
Posts (Atom)










































