Pages

335 113-7 shunting at Muhldorf Depot

Thursday, 24 December 2009

7mm SPA Progress

I've completed the assembly of the first of the 7mm kits I've been working on, and I think the result is quite reasonable given the fairly rough and ready nature of the mouldings.

The lack of believable brake levers led to a rummaging through the 'bits' box; parts were borrowed from the leftovers from previous kits, one side from a Grampus the other from a VGA. It goes to emphasise why you should never through anything away.

All that remains is to give it a coat of Railfreight 'flame red', and apply transfers.


No comments:

Post a Comment