Pages

335 113-7 shunting at Muhldorf Depot

Showing posts with label international models. Show all posts
Showing posts with label international models. Show all posts

Thursday, 19 December 2013

Bahnland Bayern - December Update

Some more progress to update on the Bavarian HO layout; the overhead catenary (by Viessmann) has been installed over the rive bridge and towards the eastern end on the first large scenic board. The campsite at the 'country' end of the layout is largely complete, just some hedging to fit between the caravan pitches. I've now begun the main Bavarian riverside tavern, on the eastern bank of the river. I'm also planning a small loco fuelling point to the rear of where the two electric locos are stabled to the rear of the second photo.




Sunday, 17 November 2013

Bahnland Bayern in HO

Some more progress shots, apologies for the poor lighting, these were just taken with my iPhone once modelling had finished for the day to record the days activities. The basic elements for the Bavarian scene are all pretty much there; the Schloss, complete with beer garden, the Black forest imbiss & bier chalet, and the mountains.

I've also begun to install the overhead catenary, this time I'm going for Veissmann, rather than Sommerfeldt as the masts are more accurate for the region and era I'm modelling. Many more to be fitted before I'm done.

Compare the second photo with one taken from roughly the same angle just over a year ago and the progress is quite dramatic.

Sunday, 21 October 2012

European Layout - Update

I had originally planned to spend this weekend adding DCC turnout decoders to Widnes Road, which would have meant dragging it all upstairs from the dungeon and setting up in the dining room in order to wire the boards up to test the installation.  

I tested the first decoder before committing to rewiring the whole layout, and lo and behold, a DCC 'funny' occurred. It worked OK on my old ZTC system, but the much newer ECoS would not recognise the decoder (an NCE Switch-it). 

Much head-scratching and consultation the internet later and I was not much further forward, so abandoned that idea while I waited on the font of much of this black art, Kevin from Coastal DCC to get back to me. So instead, I roped Alice, my better half, into helping (well, more accurately, do-ing) the emerging scenery on my permanent HO European layout.

It turned out that the decoder issue is a clash with Railcom on an earlier firmware installed on the ECoS, and it all works fine now, but by then it was too late to put Widnes Road up and it can wait until another weekend. As it is, really good progress has been made with the base layer of scenery; namely the river bed, and hills which form a scenic break between the layout and fiddle yard.


The grey area next to the river wall is where the large pub will go, with beer garden on both sides of the railway line. On the other side of the river will be a camp site, running up the hillside.



Tuesday, 28 April 2009

'Muizen' Progress - The first tracklaying

Another weekend of successful woodworking and I've been able to get the first track down, at least in 'first draft'. It's to give me an idea of whether I can keep to my plan of a minimum radii of 30-36" even on the off-scene parts; and initial tests are hopeful. Although it's not too clear in the picture all track will be laid with prototypical super-elevation or 'cant'.

I've already rebuilt the 'removable' section by the door to ease the track radii from 28" to a generous 36", and to ensure that where the track joins the main baseboard from the 'bridge' it does so perpendicularly to allow for a reliable rail joint.

The second photo shows the main off-scene area; this allows a continuous run to be achieved and also accommodates a 4-road fiddle yard for up to 6/7 coach trains plus locos, this will be laid as far as the wall in the distance. The four tracks to the right of the picture are placed to gauge the depth needed for a useable storage yard; this quarter of the layout will not be modelled.

All track is the HO-Elite system from Tillig, obtained from international models in Wales, who provide an excellent range and great, friendly service. I consider the Tillig track a good compromise for a layout that doesn't leave home. Whilst my exhibition layout Widnes Road has only hand-build turnouts, for something of the size I'm planning for Muizen I felt it really was a bit of a tall order, plus would have slowed progress by 6-12 months. The Tillig track once ballasted and weathered, and fitted with slow action Tortoise or Fulgerex point motors can look nearly as good and has all the excellent slow-running characteristics of live-frog continuous point blade turnouts.

The final shot shows the layout in context in the main basement railway room (Widnes Road has it's own room!) It really is starting to dwarf Singen Hbf, but the design allows for either layout to be operated independantly, and the central layout is easily moveable if extra room is needed at one side of the room for modelling. Next task is to get the windows in the room replaced and then the main baseboards along the longest wall can be built, and a continuous run laid.