Some more progress to update on the Bavarian HO layout; the overhead catenary (by Viessmann) has been installed over the rive bridge and towards the eastern end on the first large scenic board. The campsite at the 'country' end of the layout is largely complete, just some hedging to fit between the caravan pitches. I've now begun the main Bavarian riverside tavern, on the eastern bank of the river. I'm also planning a small loco fuelling point to the rear of where the two electric locos are stabled to the rear of the second photo.
An online home for all my railway ramblings both model and prototype. This blog features regular updates on my varied model railway projects as well as occasional forays into the real world.
Showing posts with label international models. Show all posts
Showing posts with label international models. Show all posts
Thursday, 19 December 2013
Sunday, 17 November 2013
Bahnland Bayern in HO
Some more progress shots, apologies for the poor lighting, these were just taken with my iPhone once modelling had finished for the day to record the days activities. The basic elements for the Bavarian scene are all pretty much there; the Schloss, complete with beer garden, the Black forest imbiss & bier chalet, and the mountains.
I've also begun to install the overhead catenary, this time I'm going for Veissmann, rather than Sommerfeldt as the masts are more accurate for the region and era I'm modelling. Many more to be fitted before I'm done.
Compare the second photo with one taken from roughly the same angle just over a year ago and the progress is quite dramatic.
I've also begun to install the overhead catenary, this time I'm going for Veissmann, rather than Sommerfeldt as the masts are more accurate for the region and era I'm modelling. Many more to be fitted before I'm done.
Compare the second photo with one taken from roughly the same angle just over a year ago and the progress is quite dramatic.
Sunday, 21 October 2012
European Layout - Update
I had originally planned to spend this weekend adding DCC turnout decoders to Widnes Road, which would have meant dragging it all upstairs from the dungeon and setting up in the dining room in order to wire the boards up to test the installation.
I tested the first decoder before committing to rewiring the whole layout, and lo and behold, a DCC 'funny' occurred. It worked OK on my old ZTC system, but the much newer ECoS would not recognise the decoder (an NCE Switch-it).
Much head-scratching and consultation the internet later and I was not much further forward, so abandoned that idea while I waited on the font of much of this black art, Kevin from Coastal DCC to get back to me. So instead, I roped Alice, my better half, into helping (well, more accurately, do-ing) the emerging scenery on my permanent HO European layout.
It turned out that the decoder issue is a clash with Railcom on an earlier firmware installed on the ECoS, and it all works fine now, but by then it was too late to put Widnes Road up and it can wait until another weekend. As it is, really good progress has been made with the base layer of scenery; namely the river bed, and hills which form a scenic break between the layout and fiddle yard.
Tuesday, 28 April 2009
'Muizen' Progress - The first tracklaying
I've already rebuilt the 'removable' section by the door to ease the track radii from 28" to a generous 36", and to ensure that where the track joins the main baseboard from the 'bridge' it does so perpendicularly to allow for a reliable rail joint.
The second photo shows the main off-scene area; this allows a continuous run to be achieved and also accommodates a 4-road fiddle yard for up to 6/7 coach trains plus locos,
All track is the HO-Elite system from Tillig, obtained from international models in Wales, who provide an excellent range and great, friendly service. I consider the Tillig track a good compromise for a layout that doesn't leave home. Whilst my exhibition layout Widnes Road has only hand-build turnouts, for something of the size I'm planning for Muizen I felt it really was a bit of a tall order, plus would have slowed progress by 6-12 months. The Tillig track once ballasted and weathered, and fitted with slow action Tortoise or Fulgerex point motors can look nearly as good and has all the excellent slow-running characteristics of live-frog continuous point blade turnouts.
The final shot shows the layout in context in the main basement railway room (Widnes Road has it's own room!) It really is starting to dwarf Singen Hbf, but the design allows for either layout to be operated independantly, and the central layout is easily moveable if extra room is needed at one side of the room for modelling. Next task is to get the windows in the room replaced and then the main baseboards along the longest wall can be built, and a continuous run laid.
Subscribe to:
Posts (Atom)














