Pages

335 113-7 shunting at Muhldorf Depot

Sunday, 23 August 2009

Depot Progress (Widnes Road)

Progress lately has focused on improving the appearance of the main depot building, with the fabrication of a new depot floor with recessed tracks, an inspection pit and full length inspection walkway.



No comments:

Post a Comment