Pages

335 113-7 shunting at Muhldorf Depot

Monday, 18 April 2011

Widnes Road - Fiddle Yard Mk.IV

Work has been continuing apace on Widnes Road now there is a break in the exhibition programme. The first task was the (re-)building of the main fiddle yard, to produce the 4th version. The original was three roads wide and only long enough to stable three locos. This, hopefully the final iteration of the eastern fiddle yard is now able to accommodate fairly long trains, as the images show. Once the second fiddle yard is built, which will be behind the operators, accessed by a hidden curve from the western end of the layout, the operational potential of Widnes Road will improve dramatically.
The high level road seen at the rear of the yard is now wired, and can be used as both a programme track and a test track during exhibitions, when running a loco on the layout only for it to die after three feet can prove embarrassing.

No comments:

Post a Comment