Pages

335 113-7 shunting at Muhldorf Depot

Saturday, 24 April 2010

Some pictures from the Welwyn GC Exhibition

Living the life of a somewhat subterranean railway modeler its not often that what I build has the benefit of good natural lighting. Last weekends exhibition in Welwyn Garden City was a real opportunity to take some photos, as it was blessed with excellent lighting on a bright spring day. Despite only having a compact digital camera with me I was pleased with the results.   

There is a few months until a good run of four exhibitions in close succession in the Autumn. This means I can get cracking on the parade of shops which will form the other side of Widnes Road and complete the western end of the layout. A combination of kit-bashing and detailing is the order of the day. I'm on the lookout for any company that does the basic components for shop interiors in 4mm and a decent kit to base a detailed public house on.

Wednesday, 7 April 2010

Widnes Road Signal Box - Part III


The completed signal box complete with interior and lighting has been installed on the layout next to the new level crossing. The through main line is laid ready for the extension of Widnes Road to allow end-to-end operation using two fiddle yards.

Tuesday, 6 April 2010

Widnes Road Signal Box - Part II


Having spent some time making a fully detailed interior, some decent internal lighting was required. A strip of three white LED's provided plenty of light and was easily hidden in the roof.

Saturday, 3 April 2010

Widnes Road Signal Box

The new signal box for Widnes Road level crossing is taking shape nicely; the Ratio Midland region box with a fully detailed interior.