Pages

335 113-7 shunting at Muhldorf Depot

Sunday 14 March 2010

Widnes Road - Level Crossing

The level crossing at the western end of Widnes Road starts to take shape; the gates are Wills, the pedestrian guards are made from styrene rod filed to triangles. Next task is to complete the signal box to go alongside the crossing which will have a fully detailed interior.